What changes have been made to the Western Renewables Link project?

In 2023, it was confirmed that the Western Renewables Link is now proposed as a 500kV transmission line from Sydenham to Bulgana, and will no longer connect into the Waubra Terminal Station. As a result, the proposed terminal station to the north of Ballarat will no longer be required and new terminal station works will be required near the existing Bulgana Terminal Station. The exact location of the proposed 500kV switchyard has not yet been determined but is proposed to be near to and connected with the existing Bulgana Terminal Station. The Sydenham Terminal Station Rebuild will be completed as a separate project.

We have been working with landholders since 2023 in an identified corridor to the north of Waubra to identify a new proposed route in this area, and we are undertaking further field surveys and investigations to inform these changes.