Terminal stations

Where will the proposed terminal stations be?

In 2023, it was confirmed that the Western Renewables Link is now proposed as a 500kV transmission line from Sydenham to Bulgana, and will no longer connect into the Waubra Terminal Station. As a result, the proposed terminal station to the north of Ballarat will no longer be required. New terminal station works will be required near the existing Bulgana Terminal Station. The exact location of the new 500kV switchyard at Bulgana has not been determined but it is proposed to be near to and connected with the existing Bulgana Terminal Station.

The Sydenham Terminal Station Rebuild is being completed as a separate project. The Western Renewables Link will connect into the rebuilt Sydenham Terminal Station. These connection works will be included in the Western Renewables Link Environment Effects Statement assessment.

Previous FAQ
When will transmission line infrastructure be inspected?
Next FAQ
How big will the proposed new 500kV switchyard near Bulgana Terminal Station be?